Marking citations are to ASME B30.26-2015 (reaffirmed 2020). B30.26-2026 was issued February 26, 2026 and becomes effective one year after that date. Clause-number changes in the 2026 edition are not confirmed, so they are not cited.
OSHA citations on this screen are 29 CFR 1926.251, labeled OSHA construction rigging. Live-event work is not treated as a construction site by this check. 29 CFR 1910.184 covers slings. No shackle-specific marking clause was found in it.
- ASME B30.26, purchase page
Paywalled. This app paraphrases and cites section numbers. It does not copy the standard.
- 29 CFR 1926.251, OSHA construction rigging
Public. Employers inspect rigging equipment before use on each shift and remove defective equipment from service. Shackles are not to be loaded above the rated capacity on the manufacturer’s legible identification markings.
- 29 CFR 1910.184
Public. This section covers slings. No shackle-specific marking clause was found in it.
- Federal Specification RR-C-271G
Public text of the 2016 revision. Makers cite different revisions. This app shows the maker’s claim and does not check it.
- EN 13889 at BSI
Paywalled. For EN grade 6 dee and bow shackles, the paraphrase used here is: WLL in tonnes, grade 6, manufacturer name or symbol, and a traceability code.
ASME B30.9 (slings) and ASME B30.10 (hooks) are related. This app does not check slings or hooks. Inspections under B30.26 are done by a designated person. A qualified person decides whether a condition is a hazard and whether a removed shackle may return to service.